Welcome to our Home Building ParTay!! This is the place to walk step by step (day by day) with us as we make our MT House into a Home!

Thursday, June 5, 2014

Day 139: Electrical & Well Pump



They worked on the back dining nook roof. It's not anything like the picture on our plans so hopefully they aren't done. If they are- we will have to have a chat. I just think it's ugly.

They are wrapping windows to seal them.

 Jess got the electrical stuff hooked up to the panel. Looks snazzy!

It also looks like he got a cable box installed in the utility room. At least the wires going into it match the cable wires in the master bedroom, the living room and the den.

Scott got the plumbing to the basement bathtub. And installed the drain kits in the tubs. It looks like he is measuring the pressure down there or that is gonna be one interesting bath. LOL

And last but not least- they installed our variable speed well pump. It's way little so we'll have to check if that's normal or if we also need a storage container as well. It's so cute and tiny.

No comments:

Post a Comment