Welcome to our Home Building ParTay!! This is the place to walk step by step (day by day) with us as we make our MT House into a Home!

Monday, June 9, 2014

Day 143: Windows, Warmth, and Trim



Downstairs windows were installed. All the windows have been sealed.

A lot of the insulation was put up in the basement. It makes our house way warmer and protected from the wind.

 The drywall sheets were delivered.

Outside- the trim is being put up.
And the roof shingles are being laid.

Moving right along. Happy Day!

P.S. Chuck ordered the inside doors today. And unfortunately, it looks like we will be sticking with the weird back gable. He said there was no other way to make it work. Bummer!

No comments:

Post a Comment